- Distribution of electricity for station auxiliaries VHV, HV,LV, protection calculation
- Distribution mains LV, HV (6 kV, 22 kV, 30 kV, 35 kV), VHV (110 kV)
- Electricity and heat generation (cogeneration)
Ref card of selected projects and studies from engineers of Průmyslový Projekt Plzeň, Ltd.
ČEZ, a.s. - Power plant Ledvice, preliminary and implmentation documentation of fabrication
- Modernize protection of wiring VHV

- Filling station Dolní Zálezly - comlex reconstruction
- Reconstruction of switchin station 6 kV - R0.4
- Reconstruction of central control room CED
- Group regulator of voltage blocks - hi-level power part
- Fly ash handling of blocks B2, B3 - power supply
- Span reconstruction 110 kV, V980, V981
- Fluidized-bed boiler K4 reconstruction - electro
- SKŘ CHÚV II
- Circuit breaker setting on the block B3 - DSP
- GOR B3 - shortings signalization on WDPF
- GOR B2 - board synchronization reparation - out of control sys.
- Controlilg of dredge station BS1 reparation
- The old control room CD disconection from B2/B3
- More buildings ČEZ, a.s.
ČEZ, a.s. - Power plant Počerady preliminary and implentation documentation of building
- Fly ash handling - electro part
ČEZ, a.s. - Power plant Tušimice preliminary and implentation documentation of buildings
- IŘS sets- controling and information system of fly ash handling - cable junction
- inhibition of activity ETU I - study of electro part
Other buldings for ČEZ a.s. - Power Plant Ledvice ELE
- Accumulator plant 220 V
- transformer stand T015
- power suply ZS desulfurization K2, K3 electrical power
- Transformer station 6/0,4 kV "Světec"
- Distribution point retool 6 kV v ELE
- Electro part of block B1 and B4 Disasembly
- Reconstruction of electro-part B4 - DSP
- Exciter package of generator of block B4 exchange
- Back-up exciter 110 MW reconstruction
- Water works adjustment at ELE
- DG 500 kVA Reconstruction at ELE
- Ash material conveying at ELE - electropart
- Fly ash mixing centre MCII - DSP electro
- self-consumption switching station cair conditioning
- Office building air conditioning
- Main circuit breaker on the block B3 - DSP
- Air blast circuits systems reconstruction
- Overhaul distribution on the blocks B2/B3
- Fireproof wall for coal crushing plant
- Translocation UPS from CD to SI
- Application KKS code in self power consumption at ELE
- Compensation DK by optical fibre link OPWG
Top
More buildings in the power energy
JČE - Heating plant Písek
- Clinkering and pneumatic handling of fly ash
- Crude water filling station
JČE - Heating plant Strakonice
- Repair of garbles and classer near of buckets 12,13
- Electro control room reconstruction
- Desulfurization of heating plantStrakonice: FGD - DSP
Etc.
- Schoeller Litvínov Transformovna 22/0,525 kV
- ŽPSV Uherský Ostroh Stožárová transformovna
- Plzeň - Bukovec Stožárová transformovna
- Betonárka Hořovice Stožárová transformovna
- Svrčovec Výroba těstovin - elektročást
- SPŠS Plzeň Posouzení kompenzace účiníku
- PHM Všeruby Přípojka VN a transformovna
- SIEMENS Stříbro Změna motorických rozvodů
- PRAZDOJ Plzeň, a.s Optimalizace spotřeby el. energie, část el. napájení
- STV Glas Val. Meziříčí Výroba kyslíku v STV, napájení 6 kV
- Kotelna Domažlice Elektročást
- CHEMOPETROL Litvínov Čerpací stanice K1/710 - elektročást
- Doly Nástup Tušimice Elektrodokumentace reko pasového vozu PVZ 1600
- Velveta Varnsdorf Rekonstrukce rozvodny VN/NN
Top